System Maintenance in Göttingen
From the 10th to the 17th of February there was a system-wide maintenance in Göttingen. The purpose of the maintenance was to upgrade our software as well as the operating system to match those on the ‘Lise’ system in Berlin. Additionally, there were firmware upgrades for the file systems.