Maintenance at the Emmy System in Göttingen

NHR > Maintenance at the Emmy System in Göttingen

System Maintenance in Göttingen

From the 10th to the 17th of February there was a system-wide maintenance in Göttingen. The purpose of the maintenance was to upgrade our software as well as the operating system to match those on the ‘Lise’ system in Berlin. Additionally, there were firmware upgrades for the file systems.